Developing Project
"Plantin Park"

Latest News!!

8th Aug
Old Play park_edited.jpg

Boyne Row

the  plantin

community footbridge

old playwark

Linen Monument

New all ability
entrance

XXX
CLOSED

The map shows the position and size of the old play park area and the photos are a record of its present condition.

POSITIVES

+ Its place at the centre of the village.                 + Existing fencing 75% in place.    

+ Perfect entry / exit point for 'the planting".          + South facing aspect perfect for recreation

+ Some essentials already in place: bins, benches, flower beds, hard footing

+ Volunteer work groups will see quick results from their efforts

+ Community electricity already on site

+ a simple step by step development plan will mean that it can be brought into community use quickly

+ Perfect location / access for Forest School hub "container / mobile etc"

CHALLENGES

- Large area if materials are to be needed.    -  Child friendly gate/access at Kilrea Road

- Child friendly gate / access at Community Footbridge

- Child friendly fence to Kilrea Road

OPPORTUNITIES

**A blank canvas: can be planned to meet needs of every community member

** Should be a very attractive facility for grant funding

** Ties in perfectly with the planting and future Mill Site / Dams pathways

12th December 2025

Planting Park becomes a fabulously lit winter wonderland

for
our Christmas Lights Switch-on and a visit from Santa!

12 th August

12th August 2025

More hard work from the community has resulted in the following progress:


**Further applications for support, grant aid etc.

**Further consultations with  various MUDC officers

** Mapping of the three paths in The Plantin: particular attention to gradients
**Quantity E
stimations made (!!)

**Kind and generous input from our own "Glenn" who played a part in the Drumlamph Wood Scheme

**Progress on Insurances etc.

** Mitigating work on 'River Path' tripping / bank erosion hazards is taking place

AGAIN!...This looks as if it WILL happen so long as there is a suitable level of community support and actual involvement.

Anchor 1

9th August 2025

New Village Signs are up!!

This looks as if it WILL happen so long as there is a suitable level of community support and actual involvement.

Screenshot 2025-08-13 at 15.00.18

Screenshot 2025-08-13 at 15.00.18

Screenshot 2025-08-13 at 15.00.34

Screenshot 2025-08-13 at 15.00.34

Screenshot 2025-08-13 at 14.59.45

Screenshot 2025-08-13 at 14.59.45

Screenshot 2025-08-13 at 15.00.03

Screenshot 2025-08-13 at 15.00.03

Screenshot 2025-08-13 at 15.00.47

Screenshot 2025-08-13 at 15.00.47

12th July 2025

Much hard work from the community has resulted in the following progress:


**CLOSURE of the playpark entrance directly on to the Kilrea Road (PERMANENT)
This complements our discussions with local councillor / MLA towards the  goal of improved road safety generally for everyone crossing the busy Kilrea Road.

** Opening of a safer, wider entrance from the Linen Memorial 

**First foundations of an 'all abilities' entrance ramp in place

** Removal of broken, dead/dying overhanging trees branches

** Scraping off the surface to establish condition etc.

** Retention of old entrance railings for use in a later 'build'

** Start of removing scrub and overgrown hedges

** Removal of fly-tipping refuse etc.

This looks as if it WILL happen so long as there is a suitable level of community support and actual involvement.

20th June 2025

The JHT (Turkington's, Portadown) (draft) offer of a community lease relating to the ground known locally as 'The Old Playpark" and 'the plantin" is with both sets of lawyers.
A substantial phase 1 grant application has been formulated.

This looks as if it WILL happen so long as there is a suitable level of community support and actual involvement.

8th February 2025

In the most amazing bonus to our community's efforts to further develop community facilities,

we were approached by JHT (Turkington's, Portadown) who have made an offer of a community lease relating to the ground known as 'The Old Playpark" which is joined to 'the planting' by the community development group bridge.

This is beyond our wildest dreams and is an offer we're definitely exploring so long as there is a suitable level of community support.

Coming Soon: About to Happen

As soon as possible we are hoping to be able to bring a focus group together on site

to gather opinions on accessibility.

The first meeting will be about suitability, changes needing to be made etc. at:
1. The new entrance: getting to it (existing pavements etc.)

2. the new entrance: getting down the slope and into the park.

3.  Access ONTO and OFF the community bridge between the park / plantin.

(Other access matters will be addressed as the park develops)
.

The Road Engines Mill Race
Some very basic introductory clearing will begin to help us with measurements, material needs etc.
​​

These activities WILL happen so long as there is a suitable level of community support and actual involvement.